Muir High School FAQ

John Muir High School Gym/Aquatics Modernization and Upcoming Tree Removal: Frequently Asked Questions

Why are trees being removed at John Muir?

The trees scheduled for removal are within the footprint of the long-planned gymnasium and aquatics modernization project.

This project has been in development since 2024 and includes a new pool and pool deck, modernized gyms and locker rooms, team and instructional spaces, accessibility improvements, a new entry and lobby, landscaping and other site improvements. 

These trees would need to be removed for the modernization to proceed regardless of the Eaton Fire.

Is the tree removal happening because of soil contamination from the Eaton Fire?

The tree removal was already part of the gym and aquatics modernization.

The Eaton Fire later created an additional issue: environmental testing identified contaminated soil in portions of the campus, including areas affected by the modernization. This means PUSD now has to address both the long-planned construction work and the environmental conditions created by the fire.

How long has this project been planned?

Formal visioning for the gym and aquatics modernization was underway by May 2024, well before the Eaton Fire. The planning and engagement process focused on student experience, athletics, learning, community use, and safety and security. 

By August 2024, schematic design work was already underway for the broader John Muir modernization project. 

What is actually being built?

The modernization includes a new pool and pool deck, improvements to the large and small gyms, upgraded locker rooms, new team and instructional spaces, modernized restrooms, a new entry and lobby, accessibility improvements, landscaping and related site work. 

The plans also include substantial athletic and aquatics improvements intended to better serve students and the broader Muir community. 

Why is this project important?

The existing gym and aquatics facilities are being modernized to provide students with safer, more functional, and more welcoming athletic and instructional spaces.

The original visioning process explicitly prioritized student experience, enriched learning, family and community engagement, and safety and security. 

This is intended to be a long-term investment in John Muir, not simply a replacement of individual facilities.

Does the soil contamination change the project?

It adds another layer of work, but it does not change the underlying purpose of the modernization.

PUSD now has the opportunity to address contaminated soil in affected areas as the site is being prepared for major construction, rather than complete a significant modernization while leaving an environmental hazard unresolved.

Could PUSD simply leave the trees and redesign the project around them?

The current project has been developed over an extended planning and design process around the needs of the gymnasium and aquatics complex, including the pool, athletic spaces, circulation, accessibility and other site improvements.

The trees scheduled for removal are within that project footprint. Preserving them would require substantial changes to a project that was planned before the Eaton Fire and designed around the long-term needs of the school.

Leaving the trees in the contaminated soil would cause the areas of contaminated soil that would not be excavated to be fenced off from use or capped with an impervious surface. The campus would be under a California Department of Toxic Substances Control (DTSC) Land Use Covenant until the contaminated soil is removed. It would also no longer have DTSC sign off for state matching funds to modernize or construct at the campus in the future.

Is PUSD replacing the trees that are removed?

Yes. Landscaping is part of the modernization project, and the District’s broader policy is to replace trees that must be removed and to increase long-term campus canopy.

The goal is not to leave the area stripped of landscaping. It is to complete the modernization and ultimately provide students with improved facilities and restored outdoor spaces.

What should the community expect next?

Tree removal and site preparation will occur as the gym and aquatics modernization moves forward, alongside the separate soil-remediation work required as a result of the Eaton Fire.

The work may be highly visible in the short term, but it is part of a project that has been planned for years and is intended to deliver a substantially improved gym, pool, athletic and outdoor environment for John Muir students and the community.